Notre Dame Video

The University of Notre Dame partnered with ANC to install the first major video display system into the iconic Notre Dame Stadium. All steel fabrication for this project was done by Rearden Steel in Lemoyne, PA and galvanized by V&S Lebanon Galvanizing LLC in Jonestown, PA. The entire job consisted of over 250-tons of steel.

The video display system is part of a nearly 800,000-square-foot construction project that has added new structures to the west, east, and south sides of Notre Dame Stadium, transforming it into a year-round venue. The video display system will be highlighted by the largest 10mm surface mount (SMD) display in college football, featuring the most physical pixels in an NCAA outdoor venue.

Additional Projects

The Wells Fargo Center, home of the Philadelphia 76ers and the Philadelphia Flyers, was opened in 1996.
Wells Fargo Center

Wells Fargo Center

Originally galvanized and constructed in 1996, the galvanized steel has continued to stand the test of time in the oceanfront corrosive environment.
The Great White Roller Coaster

The Great White Roller Coaster

The Hudson River Park Gansevoort Peninsula width is much wider than other Hudson River Park’s typical piers, ARCHITECTS were able to build a 250’ x24’ small dog park in the center of the Peninsula.
Gansevoort Peninsula Dog Park

Gansevoort Peninsula Dog Park